Running Three Jobs at Once Without Going Crazy
Some practical advice for when you've got too many builds happening at the same time.
One job runs on memory. Two runs on a good diary. Three or more runs on a system, or it runs you. The builders who handle several concurrent builds without living in the ute are rarely working harder — they have just removed the decisions that do not need making.
Put every job on the same program
Separate spreadsheets per job hide the only thing that matters when you are juggling: which trade is needed where, in which week. One program across all jobs makes clashes obvious a fortnight out, when they are still cheap to fix.
Fix a weekly rhythm and defend it
- Monday: confirm the week's trades and deliveries across every job
- Midweek: site walks, photos, and defects logged as you go
- Thursday: client updates and any variations priced
- Friday: claims out, next week's calls made
The value is not the specific days. It is that nobody — including you — has to decide when the admin happens.
Know your critical stages
On a residential build, a handful of moments carry most of the risk: slab, frame, lock-up, and practical completion. A delay elsewhere is annoying. A delay at those points pushes every following trade and, usually, a progress claim. Watch those, and stop treating every task as equally urgent.
Make trades self-serve
Most of the interruptions in a builder's day are people asking for information that already exists — the current plan, the site address, the gate code, when the slab is going down. Publish it once, in a place they can check, and the phone gets quieter.
Decide what a delay costs before it happens
Write down the rule: if the sparky cannot start within three days, you reschedule rather than have them stand around. If a selection is not confirmed by a set date, the standard item goes in and a variation follows. Rules made calmly on a Sunday beat decisions made angrily on site.
The one number to watch per job
For each build, track committed cost against the budget you priced, updated as variations land. If you can only maintain one figure per job, make it that one — it is the first place a job in trouble shows up.
Run the whole job in one place
inBuildify keeps enquiries, quotes, the build program, client selections and progress claims on the one job record — built for Australian builders.
More builder notes
- Why Using a Proper CRM Actually Helps Your Building Business
- What's New in Building Tech This Year
- Keeping Clients Happy (And Off Your Back)